Let's help you!

Vill. Mandour, Naraingarh Road,
Ambala City Haryana-134003
Email: marketing@hmminfra.com
Email: info@hmminfra.com

Civil
Engineering

Design and construction of 7.870 km long Viaduct from Daulatpur Chowk to Kartoli Punjab block section of Nangal Dam- Talwara new B.G. Rail link, Northern Railway

Picture26
Picture27
Picture28

Construction of Road Over Bridges (ROBs) at 2 Locations (LC No. 50A- km 620/03-05 and Bhusawal-Amravati Section at LC No. S1- km 664/11-12) & RUB at LC S3 in Lieu of LC Gates in Maharashtra area on Bhusawal division of Central Railway

Picture29
Picture30

Construction of ROB (Road Over Bridge on existing level crossing) on Keshorai Patan – Arneta Road (Kota-Lakheri) (MDR-212) at LC No. 120 in District Bundi at Km. 942/18-20 (Kota – Gangapur City Section) in the state of Rajasthan

Picture31
Picture32
Picture33

Construction of Cable Stayed Road over bridge (Tilak Bridge) near Dadar Railway Station, connecting Dr. N.C. Kelkar Road & Dr. Babasaheb Ambeddkar Road (in between Railway Km. EP/9/108 to EPDR 8002) in Mumbai suburban

Picture34
Picture35